
149.8MW Powered-Land Data Center Development
Project represents a powered-land develo…
- 希望価格
- 価格は応相談
- 売上
- 未確定
- EBITDA
- 未定

Project Racehorse represents a large-scale campus development opportunity in New Cumberland, West Virginia, strategically positioned along the Ohio River corridor and within proximity to Pittsburgh.
The project combines a substantial industrial development footprint with the potential for a dedicated behind-the-meter (BTM) power generation facility, access to regional natural gas infrastructure, and nearby high-voltage transmission networks.
The site is being positioned for AI infrastructure, hyperscale data centers, and other energy-intensive industrial applications, with a proposed phased power development strategy.
KEY INVESTMENT HIGHLIGHTS
SITE & DEVELOPMENT POTENTIAL
The property offers a substantial development footprint, reportedly comprising approximately 900–1,000 acres, with potential expansion to 1,500–2,000 acres.
The site is being considered for a large-scale campus development, with a focus on AI and hyperscale data center infrastructure.
The land classification and final transaction boundaries remain subject to confirmation, with site preparation, utilities and generation infrastructure requiring further development.
POWER & ENERGY INFRASTRUCTURE
The proposed energy strategy is centered on a dedicated build-own-operate power generation facility, targeting an initial 500 MW of behind-the-meter capacity within approximately 36 months.
A longer-term expansion target exceeding 2 GW has also been indicated, subject to confirmation of the development scope, generation capacity and delivery milestones.
Additional infrastructure considerations include:
UTILITIES & CONNECTIVITY
Natural Gas: Reported on-site TC Energy / Columbia Gas pipeline infrastructure, with regional access to Rover, Nexus and TETCO systems.
Water: Proposed Ohio River cooling-water system with a reported capacity of 150,000 gallons per minute, requiring approximately 12 miles of pipeline infrastructure.
Municipal Utilities: City of New Cumberland potable water and sewer services identified.
Fiber Connectivity: Nearby fiber infrastructure reportedly includes Horizon, Glo and Zayo networks, providing potential connectivity options subject to carrier confirmation.
TRANSACTION OVERVIEW
| Item | Details |
|---|---|
| Project | Project Racehorse |
| Location | New Cumberland, West Virginia, USA |
| Indicative Asking Price | USD 75,000,000 |
| Reported Land Area | Approximately 900–1,000 acres |
| Initial BTM Power Target | 500 MW |
| Target Development Period | Approximately 36 months |
| Expansion Potential | 2 GW+ |
| Transaction Status | Early-stage development opportunity |
The seller reportedly indicates that proof of funds and escrow placement have been addressed, although supporting documentation and an executed purchase and sale agreement have not been provided for verification. An end-of-year closing target has been indicated.
| アドバイザー | Deals |
|---|---|
| MergersCorp M&A International | 21 |
| Keith Advisory | 17 |
| GCG | 9 |
| JP Morgan | 41 |
| Jefferies | 23 |
| Lazard | 26 |
| Goldman Sachs | 30 |