
149.8MW Powered-Land Data Center Development
Project represents a powered-land develo…
- 希望価格
- 価格は応相談
- 売上
- 未確定
- EBITDA
- 未定

A large-scale energy and data center development opportunity comprising a 2,100-acre site in South Texas, designed to support hyperscale AI and data center operations through dedicated behind-the-meter power generation, energy storage and independent merchant power capacity.
PROJECT AT A GLANCE
| Key metric | Project overview |
|---|---|
| Land area | 2,100 acres |
| Total planned generation capacity | 3,150 MW |
| Solar capacity | 200 MW |
| Battery energy storage | Included |
| Dedicated data center power | 2,650 MW |
| Independent merchant generation | 400 MW |
| Cooling technology | Air-cooled (ACC) |
| Location | South Texas, USA |
GENERATION & ENERGY INFRASTRUCTURE
The project incorporates multiple power generation facilities designed to support dedicated data center demand and independent electricity market participation.
2,000 MW Combined-Cycle Power Plant (CCPP): Dedicated behind-the-meter generation for a hyperscale data center campus.
650 MW Combined-Cycle Power Plant (CCPP): Dedicated behind-the-meter generation for a second data center campus.
400 MW Merchant Power Plant: Independently owned generation facility with grid interconnection through an on-site high-voltage switchyard.
200 MW Solar + Battery Energy Storage: Renewable generation and storage infrastructure supporting data center operations.
DATA CENTER CAPABILITIES
The development is designed around an integrated power-and-compute infrastructure model.
Dedicated behind-the-meter power supply.
Scalable data center hall modules to accommodate increasing demand.
Centralized control room integrating power generation, energy storage and compute operations.
Integrated campus infrastructure and supporting facilities.
Air-cooled condenser technology designed to eliminate dependence on water-based cooling for power generation.
| Milestone | Target date |
|---|---|
| Land secured | Q3 2026 |
| Initial 200 MW generation block | Q2 2027 |
| Additional 450 MW capacity | Q4 2027 |
| 2,000 MW power plant completion | Q4 2028 |
| 400 MW merchant power plant completion | Q4 2029 |
KEY INVESTMENT HIGHLIGHTS
Large-scale development footprint
2,100 acres offering substantial capacity for integrated energy and hyperscale data center infrastructure.
Dedicated power generation
Behind-the-meter generation designed to provide direct electricity supply to data center facilities.
Multiple revenue streams
Combination of dedicated data center power infrastructure and independent merchant generation.
Phased capacity deployment
Initial 200 MW generation targeted for Q2 2027, followed by progressive expansion.
Integrated energy infrastructure
Combination of natural gas generation, solar power and battery energy storage.
Cooling infrastructure
Air-cooled condenser technology designed to avoid water dependency in the generation facilities.
LOCATION & INFRASTRUCTURE
Strategically positioned in South Texas, the development benefits from:
Access to the ERCOT electricity market.
Proximity to natural gas supply infrastructure.
Road access and regional infrastructure connectivity.
Nearby reservoir infrastructure.
Engineered grid interconnection for the merchant generation component.
| アドバイザー | Deals |
|---|---|
| MergersCorp M&A International | 21 |
| Keith Advisory | 17 |
| GCG | 9 |
| JP Morgan | 41 |
| Jefferies | 23 |
| Lazard | 26 |
| Goldman Sachs | 30 |